LNG Canada - Module Installation

case study

CUSTOMER:JGC Fluor BC LNG JV.
LOCATION:Kitimat, British Columbia, Canada
MATERIAL:304 Stainless Steel

challenge

• Compressor J-spool tie-in closure welds, where tight nozzle parallelism requirement, as per compressor manufacturer (Baker Hughes), were required.

• With over 3800 piles to cap of various sizes, JFJV needed a unique and innovative solution to mechanize the process of cutting, beveling and welding.

results

In coordination with JFJV, Liburdi GAPCO provided equipment and support labor to cut and weld over 3800 piles and performed compressor J-spool tie-in closure welds.

Our team also provided:

• Training and operator supervision
• Supply of rental equipment
• On-site support to keep the equipment up and running through tough conditions
To see how Liburdi GAPCO services can assist you in your current or next project, contact us today.